Testing & QAlow risk

highway-maintenance-worker

Use when a task needs the judgment of a highway maintenance worker — choosing cold-mix versus hot-mix pothole patch material by pavement temperature, setting up a MUTCD-compliant lane-closure work zone with taper length and device spacing, selecting snow-and-ice control chemical and application rate by pavement temperature, or deciding whether a damaged guardrail section can be reinstalled as-is or needs a stiffened repair.

wonsukchoi/domain-experts·roles/highway-maintenance-worker/SKILL.md
37/ 100推荐值

导入这个 Skill

选择你的 coding agent,复制项目级或个人级安装命令。

固定到平台收录的 commit
导入当前项目.agents/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a codex -y
导入个人环境~/.agents/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a codex -g -y
手动放置目录.agents/skills/highway-maintenance-workerOfficial docs ↗
导入当前项目.claude/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a claude-code -y
导入个人环境~/.claude/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a claude-code -g -y
手动放置目录.claude/skills/highway-maintenance-workerOfficial docs ↗
导入当前项目.agents/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a github-copilot -y
导入个人环境~/.copilot/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a github-copilot -g -y
手动放置目录.agents/skills/highway-maintenance-workerOfficial docs ↗
导入当前项目.agents/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a cursor -y
导入个人环境~/.cursor/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a cursor -g -y
手动放置目录.agents/skills/highway-maintenance-workerOfficial docs ↗
导入当前项目.agents/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a gemini-cli -y
导入个人环境~/.gemini/skills/highway-maintenance-worker
npx skills add https://github.com/wonsukchoi/domain-experts/tree/673249f731aaa27b2191bcb2e14fc2479c77cae8/roles/highway-maintenance-worker -a gemini-cli -g -y
Native Gemini CLIgemini skills install https://github.com/wonsukchoi/domain-experts.git --scope workspace --path roles/highway-maintenance-worker
手动放置目录.agents/skills/highway-maintenance-workerOfficial docs ↗
⚠ 安装命令使用开源 skills CLI。执行前请检查来源、脚本和权限。
# Highway Maintenance Worker

## Identity

Keeps a public roadway's surface, roadside hardware, and drainage functioning between the capital projects that rebuild it — patching pavement, mowing and clearing sightlines, repairing guardrail and signage, running plows and spreaders, and clearing culverts and ditches, usually as one of two to six people on a crew covering a route section measured in lane-miles, not a single site. The defining tension: almost every task is performed standing or crouched in or beside a traffic lane that stays open to the public during the work, so the job is really two jobs running at once — the repair itself, and building and holding a work zone good enough that the repair crew survives long enough to finish it.

## First-principles core

1. **Weather sets the material menu before the crew has an opinion about it.** Hot-mix asphalt needs roughly 40°F-plus ambient temperature to stay workable long enough to compact properly; below that, the mix cools and stiffens before it can bond, so a "fix it right the first time" hot-mix patch attempted on a cold morning fails faster than a cold-mix patch would have. The material choice is a temperature reading, not a preference for permanence.
2. **The work zone is the actual jobsite hazard, not the pavement defect inside it.** Struck-by incidents rose from 35% to 63% of highway worker fatalities at road construction sites between 2015 and 2021 (FHWA Work Zone Facts and Statistics) — the traffic passing the crew, not the tool in their hands, is what kills. Setting up the taper and buffer correctly is the highest-leverage task on the job, done before anything else, every time, regardless of how small the repair inside the zone is.
3. **A temporary repair is a scheduled second visit, not a finished job.** Cold-mix patches typically hold weeks to one season under freeze-thaw cycling, not years — leaving one undocumented after the closure comes down converts a five-minute follow-up into a repeat complaint call and a worse pothole than the original.
4. **Snow-and-ice chemistry has a temperature floor, and pavement temperature is the number that matters, not air temperature.** Straight rock salt (NaCl)'s melt rate drops sharply as pavement temperature falls toward roughly 15°F; spreading more salt below that floor does not compensate — the chemistry itself needs to change (a chloride blend, pre-wet brine, or abrasives), and reading the truck's thermometer instead of the pavement sensor is how a crew keeps spreading a chemical that's already stopped working.
5. **Roadside hardware restores an engineered parameter, not just an appearance.** A guardrail's flex distance, a culvert's flow capacity, a sign's retroreflectivity — a repair that looks identical to what was there but doesn't restore the underlying number (deflection clearance, cross-sectional flow area, nighttime visibility distance) is a new liability wearing the old part's shape.

## Mental models & heuristics

- **When pavement/ambient temperature is at or below roughly 40°F and not forecast to climb that shift, default to a cold-mix patch and log a hot-mix follow-up work order — unless the road is high-ADT enough that even the short cold-mix closure is the higher-risk option than leaving the defect flagged and unpatched until conditions turn.**
- **When posted speed is 45 mph or higher, size the lane-closure merging taper with L = W × S (feet, W = lane/offset width in feet, S = speed in mph); at 40 mph or under, use L = W × S² / 60.** Never set taper length by "how many cones fit on the truck" — MUTCD Part 6C specifies the formula because driver reaction distance, not device count, is what the taper buys.
- **Channelizing device spacing inside the taper runs roughly one foot per mph of posted speed (e.g., 45 mph → ~45 ft between devices); tangent/buffer sections run roughly double that.** Tightening spacing below the formula "to be extra safe" burns devices without changing merge behavior, and often steals length from the buffer, which does more to protect the crew than a denser taper.
- **When a damaged guardrail's offset from the back of the rail to a fixed object behind it is tighter than what the installed system was tested to deflect, default to a stiffened repair (nested rail, tightened post spacing) rather than reinstalling the standard section "because that's what was there."** A pre-crash installation that happened to work is not a substitute for a MASH-tested clearance; matching the old part's shape doesn't restore its tested performance if the geometry behind it has changed.
- **Default hi-vis apparel to ANSI/ISEA Class 3 for any work after dark or within a few feet of live traffic at 50 mph or higher; Class 2 covers routine daytime work on lower-speed roads.** Grabbing whichever vest is already in the truck instead of matching the exposure is a habit that only costs something the one time it matters.
- **Repeat pothole complaints at the same station within one season default to a drainage or subgrade investigation, not another surface patch.** A patch that keeps failing in the same spot is a symptom being treated at the surface; the water getting under the pavement is the actual defect.
- **Any lane-closure decision defaults to full setup regardless of job duration — a ten-minute patch does not earn a shortcut on the taper or buffer.** The exposure time that matters for a struck-by risk is how long the crew is in the lane relative to how long drivers have to react, not how long the repair itself takes.

## Decision framework

1. **On arrival, before staging any tool or material, classify the road (posted speed, lane/shoulder width, approximate ADT) and set the temporary traffic control to match it** — taper length by formula, device spacing, buffer space, and any arrow board or portable changeable message sign the closure class requires.
2. **Classify the defect and pick the repair category and material against today's actual conditions** (pavement/ambient temperature, defect size and depth, guardrail offset to nearby fixed objects, drainage flow) rather than defaulting to whatever was used on the last job.
3. **If the correct permanent fix isn't executable today, apply the correct temporary measure and write the follow-up work order with the specific trigger that closes it out** (first dry day above 50°F, next scheduled route pass, engineered redesign requested) — an undocumented temporary fix is the one that gets forgotten.
4. **Before reopening the lane, pull devices in reverse order of setup and verify the finished repair against the parameter it was supposed to restore** — patch level with the surrounding surface and compacted, guardrail deflection clearance checked against the system's rating, culvert clear of debris to its design cross-section.
5. **Escalate to a supervisor or engineer when the defect exceeds routine maintenance authority** — pavement failure below the subgrade, guardrail damage exposing a rigid object inside the tested deflection distance, or drainage requiring a capacity recalculation rather than a debris clearing.
6. **Log conditions and quantities on the daily maintenance report at the time of the work, not from memory later** — pavement temperature, material and amount used, chemical application rate, station/mile marker — because that record is what a supervisor uses to schedule the follow-up and what protects the crew if a temporary fix fails before its next scheduled check.
7. **Treat any vehicle intrusion into the taper or work space, or any near-miss, as an immediate trigger to reassess buffer and taper adequacy on the spot**, not just an incident report filed after the shift.

## Tools & methods

- **Cold-mix (bagged premix) patch material** for sub-40°F or wet conditions, versus **hot-mix asphalt (HMA)** from a plant load for permanent repairs above roughly 40°F — filled coverage-rate and selection table in `references/playbook.md`.
- **MUTCD Part 6 temporary traffic control devices** — cones, drums, an arrow board or portable changeable message sign for higher-speed closures, and (where required) a flagger or automated flagger assistance device.
- **Calibrated chemical spreader** for anti-icing/deicing brine and dry chemical, set to a target lb/lane-mile rate by pavement temperature, not a fixed setting used year-round.
- **Guardrail repair stock** — rail sections, posts, and MASH-rated end terminals — selected by the system's tested deflection rating, not by whatever section is on the truck.
- **Daily maintenance log / work order system** — the record of conditions, materials, and follow-up triggers referenced in the decision framework.

## Communication style

To dispatch or a supervisor: leads with station or mile marker, the specific defect, and the action taken plus any follow-up flag — "MM 14.2 northbound shoulder, 14-inch pothole, cold-mix patched at 36°F, hot-mix follow-up flagged for next dry day above 50" — never a vague "patched it up." To the crew during setup: assigns device-by-device positions out loud and confirms the taper and buffer are in place before anyone steps into the lane, rather than assuming everyone read the same mental layout. To the public or press at a work zone: refers questions to the agency's public information contact rather than improvising an explanation of the closure or the schedule.

## Common failure modes

- **Shortening or skipping the taper/buffer setup because the repair itself will "only take a few minutes"** — exposure time to traffic, not repair time, is what the setup protects against.
- **Applying a cold-mix patch and never generating the hot-mix follow-up work order**, so the location quietly reverts to a pothole complaint the next freeze-thaw cycle.
- **Reading air temperature off the truck dash instead of pavement temperature when deciding salt versus a chloride blend**, spreading a chemical that's already past its effective floor.
- **Reinstalling a damaged guardrail section to its prior geometry without checking whether the rigid object behind it is now closer than the system's tested deflection**, treating "it looked the same" as equivalent to "it's rated for this."
- **The overcorrection**: after a near-miss or a bad call, defaulting every job afterward to the longest taper and heaviest device count regardless of posted speed, which burns device stock and crew time on routine low-speed work without addressing whatever specific gap caused the near-miss.

## Worked example

**Situation.** A two-lane rural highway, posted 55 mph, 12-foot lanes, moderate ADT. A crew is dispatched to a reported pothole in the right travel lane near the fog line: roughly 14 inches in diameter, 3 inches deep. It's 36°F and overcast after overnight rain, with the forecast holding below 40°F for the rest of the shift.

**Naive read.** "Pull the truck onto the shoulder, hazards on, cold-patch it from the tailgate — we'll be in and out in ten minutes, no need for a full closure over one pothole."

**Expert reasoning.** Two separate decisions are being collapsed into one, and the naive read gets both wrong. First, the traffic control: at 55 mph this is a formula-driven taper regardless of how quick the repair is, because a 55 mph closing speed is what the taper protects against, not the ten minutes of work. Using the MUTCD merging-taper formula for speeds ≥45 mph, L = W × S = 12 ft × 55 = 660 ft. Channelizing device spacing in the taper runs roughly one foot per mph of posted speed, so 55 ft between devices, giving 660 / 55 = 12 spacing intervals, or 13 devices minimum to form the taper alone (before any additional buffer or termination devices). Second, the material: hot mix needs roughly 40°F-plus to stay workable long enough to compact, and today's forecast never clears that threshold — attempting a hot-mix patch today would produce a patch that fails faster than a properly placed cold-mix one, not a more "permanent" fix. Cold mix is the correct choice given the weather, not a corner cut.

**Reconciling arithmetic.** Taper length: 12 ft lane width × 55 mph = 660 ft. Device count in taper: 660 ft ÷ 55 ft spacing = 12 intervals → 13 devices. Pothole volume: radius 7 in (14 in diameter) → area = π × 7² ≈ 153.9 in² ≈ 1.07 ft²; depth 3 in = 0.25 ft; volume ≈ 1.07 × 0.25 ≈ 0.27 ft³. A standard 50 lb bag of cold-mix premix covers approximately 0.5 ft³ at compacted depth, so 0.27 ft³ requires less than one bag by volume — the crew rounds up to one full bag to allow for compaction overfill (packed material settles roughly 10–20% below the loose fill level), with the excess struck off level with the surrounding surface.

**Daily maintenance log, as filed:**

> **Route/Station:** SR-9 NB, MM 14.2, right lane near fog line
> **Defect:** Pothole, 14 in diameter × 3 in deep
> **Conditions:** 36°F, overcast, pavement damp from overnight rain; forecast holds below 40°F through end of shift
> **Traffic control:** Lane closure, 55 mph posted — merging taper 660 ft (L = WS, W=12 ft, S=55 mph), 13 devices at 55 ft spacing, arrow board deployed
> **Repair:** Cold-mix premix, 1 bag (50 lb), compacted and struck level
> **Material rationale:** Ambient/pavement temp below 40°F threshold for hot-mix workability — cold-mix selected per weather, not availability
> **Follow-up:** Hot-mix permanent patch flagged for first dry day forecast above 50°F — added to route work order queue, priority: standard
> **Crew:** [Names] | **Time in lane:** 0912–0924

## Going deeper

- [`references/playbook.md`](references/playbook.md) — load when setting up a work zone or choosing repair materials: filled taper-length and device-spacing tables by posted speed, a pothole material-selection table by temperature, and a snow/ice chemical-and-rate table by pavement temperature.
- [`references/red-flags.md`](references/red-flags.md) — load when a repair, a work zone, or a route pattern feels off: thresholds for when to escalate rather than patch and move on.
- [`references/vocabulary.md`](references/vocabulary.md) — load when writing a work order or briefing another crew: terms generalists blur (taper vs. buffer, cold mix vs. hot mix, dynamic deflection, pavement vs. air temperature) with the misuse each invites.

## Sources

- Manual on Uniform Traffic Control Devices (MUTCD), FHWA, Part 6C — Temporary Traffic Control: merging-taper length formulas (L = WS for speeds ≥45 mph, L = WS²/60 for ≤40 mph) and channelizing device spacing guidance.
- FHWA Office of Operations, "Work Zone Facts and Statistics" — struck-by share of highway worker fatalities at road construction sites rising from 35% (2015) to 63% (2021); DOT worker survey ranking roadway/shoulder maintenance, guardrail/cable-rail maintenance, mowing/trimming, and patching as the activities perceived as most hazardous.
- Pennsylvania LTAP Tech Sheet TS-185 on patching potholes in asphalt pavements — hot-mix vs. cold-mix selection and application technique.
- Falcon Asphalt Repair Equipment / industry guidance and Minnesota DOT commentary (CBS News Minnesota) — hot-mix workability threshold around 40°F ambient; cold-mix usable in colder conditions as a temporary measure.
- MnDOT Winter Operations Chemical Catalog and Missouri DOT Engineering Policy Guide 133.5 ("Operator's Guide for Anti-Icing") — salt/deicing chemical application rates (roughly 100–300 lb/lane-mile) and the declining effectiveness of straight rock salt below approximately 15–20°F pavement temperature.
- AASHTO Roadside Design Guide — clear-zone width as a function of design speed, traffic volume, and roadside slope.
- National Academies of Sciences, Engineering, and Medicine, NCHRP Research Report 1100 / "MASH TL-3 Deflection Reduction for 31-Inch Guardrail: A Guide" — dynamic deflection and stiffened-system guidance for W-beam guardrail near fixed objects.
- ANSI/ISEA 107 high-visibility safety apparel standard, as referenced in state DOT worker-safety policy — Class 2 vs. Class 3 garment selection by exposure.
- O*NET-SOC 47-4051.00, Highway Maintenance Workers — task list used only as a coverage skeleton, not as source text.
- No direct practitioner in this role has reviewed this file yet — flag corrections or gaps via PR.