structural-iron-steel-worker
Docs & ResearchUse when a task needs the judgment of a structural iron and steel worker — deciding how many bolts and which pretensioning method a connection needs before a crane hook can release, setting fall-protection posture for a specific height band and role (connector vs. general worker) during steel erection, tracking which bays of a partially erected frame are still temporary-braced versus structurally complete, sizing or bounding a controlled decking zone, or diagnosing a double-connection/anchor-rod fit-up problem.